A focal point
Not the final version (honestly?), but the fireplace needed to be mocked up
First fix plumbing underway (using John Guest Speedfit, “final” sections are formed using the 3m lengths – they’re straight and stay straight)
Loading the walls with back boxes (why so many? Lack of early design and final decisions on room layout. Nothing like good planning).
The two buildings are now connected – almost – the cable is in place and comms. conduit laid over (after drilling through the utility floor)
The access chamber is from JDP
We’re in