Holes and “Moore” holes
We need to excavate the ‘pristine’ drive – the drains have passed inspection and we can hook up the surface water to the land drain that runs into the beck.
Dig out the footings for the drive / garden wall (if you’ve read earlier posts you’ll know how far we had to go to hit something suitable).
Note the “accuracy” of the marker paint (reflected in the accuracy of the footings!)
The pile of muck will, eventually, equate to another 3 of your Clive Hurt’s finest.
Return of mini Moore’s
Forgotten something?
We’re going to need a bit more than that!
And wetter
With the excavator available we’ll open up the view and add drainage
And there’s a chunk of concrete to come out – make it more patio than yard. Time to get the pecker out:-