Spring
A twelve month build now heading into the fifteenth (we had a break, but it’s still longer than expected).
With the walls painted, we can start to fit the kitchen. Chunky looking units from Howdens.
We were always going to lose storage space with the manifold but we’ll fit the oven above. Fridge and freezer units go in to the right of the window
The island units get their feet – locate the pins in the pre-drilled holes, drive them down, additional screws for extra hold, wind in the legs.
And that will do for tonight.