UFO
No longer unidentified – turns out it was a wood boring wasp, possibly trying an alternate diet.
Level access has been a constant theme during the build, going with ‘slot’ drains to the patio / garden side. Inspection booked, once passed, that should be it for drainage.
Plasterboard and more insulation delivered this week. Another top drop from C & W Berry – the 200 year old bridge survived, not even a scratch.
May be a while before we install the insulation (Sound familiar? Gone too early again?).
We’re also still pulling cables, two at once saves time (50% I guess) – Cat6a SFTP.
And the stone arrived (for the 1m plinth around the building)